For concept groups

You find out a site misses its pro forma after you sign it.

Maitre scores a whole pipeline before LOI. Engineered cost ranges, code-required scope, and a time-to-open for every site — one batch, one document, one page your board can read.

5
Sites scored in one batch
2
Flagged before LOI
$390K
Average variance on a flagged site
13 days
Received to report, per site

What you get back

  • A readiness score and a verdict for every site.
  • Buildout cost as a range, built from three subcontractor bids per system.
  • Time-to-open measured against the target date you give us.
  • The sites that don't hold, named, with the reason and the number.

Your GC’s preconstruction team prices the building you tell them to build. This tells you what the building will make you build — before the scope is yours to argue about.